Exceptional Reinforced Steel Wire for Reliable Pile Head Structures

Product Details
Customization: Available
Material: Carbon Steel
Certification: ISO
Still deciding? Get samples of $ !
Request Sample
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2024

Suppliers with verified business licenses

Audited Supplier Audited Supplier

Audited by an independent third-party inspection agency

R&D Capabilities
The supplier has 1 R&D engineers, you can check the Audit Report for more information
Production Process Visualization
You can check the supplier's production workflow chart or main facilities in the Audit Report
Quality Assurance
The supplier provides quality assurance
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
to see all verified strength labels (20)
  • Exceptional Reinforced Steel Wire for Reliable Pile Head Structures
  • Exceptional Reinforced Steel Wire for Reliable Pile Head Structures
  • Exceptional Reinforced Steel Wire for Reliable Pile Head Structures
  • Exceptional Reinforced Steel Wire for Reliable Pile Head Structures
  • Exceptional Reinforced Steel Wire for Reliable Pile Head Structures
  • Exceptional Reinforced Steel Wire for Reliable Pile Head Structures
Find Similar Products

Basic Info.

Model NO.
1-1
Customized
Customized
Whether to Support Customization
Support
Use
Architecture
Strength Level
6.8
Applicable Industries
Construction Industry
Transport Package
Container
Specification
1-30
Trademark
Huilin
Origin
Handan, Hebei
HS Code
0101101010
Production Capacity
50000

Product Description

Exceptional Reinforced Steel Wire for Reliable Pile Head StructuresExceptional Reinforced Steel Wire for Reliable Pile Head StructuresExceptional Reinforced Steel Wire for Reliable Pile Head StructuresExceptional Reinforced Steel Wire for Reliable Pile Head StructuresExceptional Reinforced Steel Wire for Reliable Pile Head StructuresExceptional Reinforced Steel Wire for Reliable Pile Head StructuresExceptional Reinforced Steel Wire for Reliable Pile Head StructuresExceptional Reinforced Steel Wire for Reliable Pile Head StructuresThe pile head wire emerges as an indispensable element in the realm of pile foundation engineering, forming a vital link between the pile body and the upper structure — be it a bearing platform or connectors. Its advanced threaded structure ensures impeccable force transmission, remarkable resistance to pull-out and shear forces, while significantly enhancing construction efficiency. Dive into a comprehensive exploration of its functional roles, structural classifications, technical specifications, ideal application scenarios, selection guidelines, and insightful solutions to common challenges:

------

The Core Functions of Pile Head Wire

1. Mechanical Connection and Force Transmission

The ingenious use of threaded engagement allows for a robust and secure connection between the pile body, such as precast concrete or steel pipe piles, and the bearing platform or anchoring device. This ensures a harmonious distribution of forces across the pile-bearing platform system.

Data: Threaded connections boast an astonishing efficiency rate exceeding 90%, significantly surpassing the traditional welding or grouting connections which hover around 60% to 70%.

Example: Within a single pile foundation tailored for offshore wind power, the resilient connection between the pile head wire and the flange effortlessly withstands a formidable vertical load of 1000 tons and a horizontal shear force of 50 tons.

2. Anti-Pull and Anti-Shear Reinforcement

The sophisticated thread profile design, featuring variants like trapezoidal or serrated threads, dramatically enhances the frictional resistance between the pile and the surrounding soil or concrete. This makes it a perfect fit for scenarios involving anti-floating or anchor piles.

• Testing: Threaded pile heads exhibit an astounding pull-out bearing capacity, ranging from 3 to 5 times higher than their smooth counterparts (e.g., increasing pull-out capacity from 200 tons to a remarkable 600-1000 tons for an 800mm diameter pile).

3. Optimization of Construction Efficiency

By eliminating the need for on-site welding and grouting processes, installation becomes a breeze with a simple twist, contributing to a staggering reduction in construction time by over 50%.

Case: A 30-story residential project ingeniously utilized prefabricated pipe piles and threaded pile heads, slashing the foundation construction period from a lengthy 45 days to a mere 20 days.

4. Quality Controllability

With factory-prefabricated threads, precision in tooth profile is guaranteed (with pitch error as tight as ≤± 0.1mm), effectively mitigating the risk of connection failures due to on-site construction errors.

Comparison: While the manually engraved threads on site achieve a qualification rate of only 70%, prefabricated threads soar above, reaching an impressive qualification rate exceeding 99%.

------

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier